Prior to the engineer visit,
you must ensure the following.
| Step |
Process |
| One |
That (if required) all Planning Permission and/or landlord approvals have been obtained.
|
| Two |
That any 'environmental' or physical work identified during the order process has been carried out
(eg roof repairs, removal of obstructions to the 'line of sight' etc)
|
| Three |
Have the minimum specification PC ready for the installation of the satellite customer premises equipment, drivers and software.
|
| Four |
Have a 'hub'/LAN for connection of multiple PCs (Satellite 500/4)
|
| Five |
Have a spare USB port (Satellite 500/1) or an ethernet connection
|
| Six |
That there is an on-site technical contact to whom the engineer can demonstrate the working service.
|
| Seven |
Be aware of the LAN configuration requirements (configuration is the customer's responsibility).
|